Infrastructure items owned and maintained by the City of Midland include water and sewer lines, storm water drainage systems, and street and alleys. The Engineering Services Department's goal is to ensure that new public improvements are designed to mesh with existing infrastructure, are sized to handle future development, and are constructed in a way that will be easy to maintain.
Learn More:
Information about current projects including paving, waterline extensions, and other capital infrastructure improvements.
Important phone numbers for reporting problems and information about streets, signals, and roadways.
Permits, specifications, studies and more.
Important maps and data for the City of Midland.
Flood Insurance Rate Map information, floodplain mapping, useful documents, and the City of Midland's Master Drainage Plan.
Information about Midland's 2017 Road Bond.
-
Phone: 432-685-7287Fax: 432-683-1786
-
Phone: 432-685-7287
-
Engineering Services Director
-
City Engineer